Faw 16 M³ Synchronous Chip Sealing Truck - sealer truck Factory
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck

FAW 16 m³ Synchronous Chip Sealing Truck

・Full-Power Take-Off System for Stable and Efficient Operation.
・Dual Hopper Design for Flexible Construction Applications.
・Intelligent Control System for Precise Operation.
・Precise Asphalt Spraying and Aggregate Spreading.
・Multi-Functional Application for Various Road Maintenance Projects.
Download
View all downloads
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • FAW 16 m³ Synchronous Chip Sealing Truck, Suizhou Hongda Automobile Sales Co., Ltd.,FAW 16 m³ Synchronous Chip Sealing Truck
  • Product Feature

  • Chassis

  • Superstructure

Product Overview

Why a synchronous sealer is different

A chip seal is decided in the seconds after binder hits the road. On a conventional job a distributor lays the film first and a separate chip spreader follows behind it, often with a second lane closure. By the time the stone lands, the film has started to skin, and the roller is pressing chips into a surface that is already setting. This truck closes that gap. The asphalt spray bar lays binder and the aggregate spreader releases stone directly behind it, sequenced by one control system, so every chip goes down on binder that is still hot and open. One pass, one closure, one crew, and a seal that keys into the surface instead of sitting on top of it. The FAW 16m3 chip sealer truck for highway surface treatment is a synchronous unit that carries 16 m³ of working volume, split between the heated asphalt tank and the aggregate hopper that make up its superstructure, on a two-axle FAW chassis. We supply the complete unit — chassis, tank, spray bar, hopper, controls and the wear parts behind them — and we build it around the road programme and the market it will work in. Send both, and the configuration conversation starts there.

One working group, one pass — the spray bar and the aggregate spreader are sequenced by a single control system, so chips meet live binder instead of a film that has already skinned.

Engine-driven working power — a full-power take-off runs the working systems from the engine, with no auxiliary engine to fuel, service or keep in step with road speed.

Automatic for the run, manual for the corners — the control system holds a set coverage along the pass; manual mode takes over at junctions, edges and short patches where a fixed setting would over- or under-apply.

A sealer that also sprays — shut the spreader off and the same unit works as an asphalt sprayer, so it keeps earning between sealing programmes.

Sized for a real highway run — the tank and hopper stay in balance to the end of the pass, so the working volume is not spent before the run is finished.

Asphalt Tank, Heating & Spray Bar

Heated through the wall, not scorched at one spot

The asphalt tank carries 8 m³ of binder. Heating is by thermal oil: the burner raises the oil, and the thermal oil pump pushes it around the oil circuit that runs against the tank wall, so the binder warms evenly instead of taking a flame at a single point. Fifty millimetres of rock wool insulation sits between the tank and the outside air, which is what holds working temperature through the haul instead of forcing a long reheat on arrival.

A bar built for one-lane coverage

Binder leaves through a spray bar fitted with 30 nozzles, covering a maximum spraying width of 3.75 m. Application rate can be set anywhere from 0.25 to 4.00 L/m², so the same bar handles a light binder film and a heavier application without a hardware change. Even coverage across the lane comes from the nozzle pattern and the overlap between jets; a bar that is set right leaves no stripes for the roller to find afterwards.

What decides a good shift

Heat and circulation are the two variables that make or break a run. A tank already at temperature when the truck reaches site takes the wait out of the start of the shift, and a circulating oil circuit keeps the whole load at one temperature rather than a hot bottom and a cool top. A blocked nozzle is the opposite problem — it shows up as a dry stripe that no amount of rolling will fix, which is why the bar and jets are checked before a run rather than at the end of the week.

The heating set-up on the 16m3 chip sealer truck for highway surface treatment is matched to the binder you intend to run, so tell us the grades and the working temperature range before the unit is specified.

Aggregate Hopper & Chip Spreading

  • 8 m³ of aggregate on board — enough stone to keep the spreader fed through the same pass the spray bar is running, so the truck is not stopping mid-run to reload.
  • Dual hopper with a controlled lift — the split hopper is raised and lowered hydraulically from the stone hopper hoist switch at the rear, and the motion is steady enough that stone does not surge out of the gate as the body comes up.
  • Monitored by CCD — a camera keeps the operator's eye on material movement inside the hopper, so a bridged or emptied side is caught before it becomes a bare strip on the road.
  • Works where clearance is tight — the hopper does not need to reach a fixed full height to spread, which keeps the truck productive under tree canopies, low bridges and site structures that stop a conventional high-lift chipper.
  • Chips land behind the bar — on the 16m3 chip sealer truck for highway surface treatment, the spreader sits directly behind the spray bar, and that geometry is what makes the seal synchronous instead of two operations run one after the other.
  • Load it with a loader or from the pile — the open hopper takes aggregate from a front-end loader at the yard or from a stockpile at the roadside; clean, dry chips protect the seal more than any setting on the panel.

Operating Sequence & Control Stations

  • Load the asphalt tank and the aggregate hopper at the yard, and start the burner so the binder is at working temperature before the truck reaches the site.
  • On arrival, place the rear of the truck at the start of the run and set the spray width and application rate from the cab control panel.
  • Move to the rear control panel for the working pass — the operator who watches the chips is the one who starts and stops the spreader.
  • Open the spray bar, bring the aggregate spreader in behind it, and pull away at a steady working speed anywhere between 2 and 16 km/h.
  • Leave the system in automatic mode on the open run; it holds the relationship between spray and spread far more consistently than a hand on a lever.
  • Switch to manual control at junctions, driveway edges, patches and the last few metres of a run, where a fixed rate would over-apply.
  • At the end of the pass, shut the spreader off first and the spray bar second, so the bar is never left laying binder with no stone behind it.
  • Back at the yard, lower the hopper, shut the burner down and let the system cool before anyone works on the bar. The on-board generator powers the control panels and the working lights, so checks can be finished after dark.

Chassis & Driveline

ParameterValue
BrandFAW
Engine Power179 kW
Transmission6-speed gearbox
Drive Type4×2
Fuel TypeDiesel
Wheelbase5300 mm
Number of Axles2
Number of Tires6
Tire Specification10.00R20 steel radial tires
Curb Weight11,800 kg
Overall Dimensions9000×2500×3530 mm
Steering PositionLeft-hand or right-hand drive, built to the destination market
Emission StandardSet to the regulations of the destination country, confirmed on the order specification

Road Maintenance Applications

Highway surface treatment

The clearest job for the FAW 16m3 synchronous chip sealer truck is a highway surface treatment programme: a worn, oxidised wearing course that needs its texture and waterproofing back without a full mill-and-replace. Because spray and spread run together, the seal is finished inside one closure, and the roller works directly behind the spreader while the binder is still live.

Provincial and rural rehabilitation

On secondary roads the constraint is usually access rather than output. The two-axle chassis reaches shoulders, narrow sealed sections and feeder links that a multi-axle sealer struggles to place, and the working volume is sized to the length of run those roads actually need.

Municipal and urban maintenance

City work is about short windows and tight space. This size is more capacity than a residential street needs, but loading, sealing and clearing a section inside a single closure is exactly what municipal crews buy it for, and manual mode handles the edges and junctions that come with kerbs and driveways.

Preventive maintenance programmes

Sealing is the cheapest way to extend the life of a road that has not yet failed structurally. Authorities running an annual sealing budget cover more kilometres per season than they would with a two-machine train, and contractors use the same unit for straight asphalt spraying between sealing jobs, so it is not parked for half the year.

Truck Cranes & Crane Parts Also Available

  • One supplier for the wider line — as a FAW 16m3 chip sealer provider we also build and supply truck-mounted cranes and crane parts, so a dealer can put a sealing unit and a lifting unit on one order and one shipment.
  • Dongfeng 6×4 12-ton truck-mounted crane — a heavier lifting unit for setting culverts, moving barriers and handling sign structures alongside road works.
  • Dongfeng 4×2 8-ton truck-mounted crane — the lighter, more manoeuvrable option for municipal yards and smaller contractors who need lifting capacity without a third axle.
  • Parts for the SQZ700-8 35-ton 8-section knuckle boom crane — boom sections, cylinders and wear parts for fleets already running this crane.
  • Parts for the SQS350-5T 14-ton 5-section straight-boom crane — straight-boom spares that keep an existing crane working instead of idling for a shipment.
  • Consolidated shipment — the sealer, the cranes and the parts can be consolidated, which saves a second freight booking and a second set of documents.

Supply & Ordering Terms

ParameterValue
Minimum Order1 unit
Selling UnitsPiece/Pieces
Place of OriginHubei, China
Productivity1000 units/month
Monthly Supply Capacity300 units/month
CertificationsCCC, ISO, CE, EMARK
Transportation ModeOcean Shipping
Loading PortsShanghai, Guangzhou, Wuhan
Payment TermsL/C, T/T
Applicable IncotermsFOB, CFR, CIF, EXW, FAS
ConfigurationChassis brand, engine power, emission standard, left- or right-hand drive, body dimensions, working system and optional equipment
Pre-delivery ChecksInspection, functional testing and road testing before shipment
Lead TimeConfirmed with your sales contact against the build slot and shipping schedule

Supply Chain & Delivery Assurance

Hongda has manufactured and exported special purpose vehicles from Suizhou, Hubei since 2013, operating as an integrated manufacturer and trader. That position lets us pull together the chassis platforms our buyers ask for — DongFeng, HOWO, FOTON, Shacman, ISUZU, FAW, JMC, BYD and JAC — configure each unit to the buyer's own specification, and handle complete vehicles and spare parts as one mixed order through a single export channel. Dealers in Central Asia, Africa, South America and Southeast Asia can start with one unit and scale from there, with one team following the order from specification through consolidation to shipment.

FAQ

Do the spray bar and the aggregate spreader always work together?

No. They are separate systems that can run together or independently. On the FAW 16m3 synchronous chip sealer truck the spreader can be shut off and the unit used for straight asphalt spraying, which is how contractors keep it working between sealing programmes and how a pass is closed out cleanly at the end of a run.

Why choose a 16 m³ sealer rather than a 20 m³ or 24 m³ unit?

Capacity buys refill distance and costs axles. A 16m3 chip sealer truck for highway surface treatment stays on a two-axle chassis and keeps tank volume balanced against hopper volume, so a working run finishes without one side running out before the other. The larger bodies earn their place on long, uninterrupted stretches where a refill stop costs more than the extra axle and the reduced access.

Who runs the sealing pass — the driver or a second operator?

Both, at different moments. Spray width and application rate are set from the cab control panel before the pass begins; the working pass itself is then run from the rear control panel, where the operator can watch the spreader and the chips landing behind the bar. The driver holds the line and the speed, and the roller crew follows directly behind.

What should be checked between shifts?

Four things repay the time: the nozzle pattern on the spray bar, the burner flame, the oil circuit for leaks and weeping joints, and the hopper gate for a clean, even opening. Keeping aggregate clean and dry before it goes into the hopper protects the seal more than any panel setting, and a jet cleared in the yard is one less interruption in the middle of a run.

Which details should we confirm before the unit is built?

Two things shape the build: the aggregate you will spread — grading and cleanliness affect the hopper gate and the feed setting — and the requirements your market places on the vehicle, such as drive side and emission standard. Send both with the road programme, and as your FAW 16m3 chip sealer provider we will confirm the configuration against them before production starts.

  • Brand: FAW
  • Engine Power: 179 kW
  • Transmission: 6-Speed Gearbox
  • Drive Type: 4×2
  • Fuel Type: Diesel
  • Wheelbase: 5300 mm
  • Number of Axles: 2
  • Number of Tires: 6
  • Tire Specification: 10.00R20 Steel Radial Tires
  • Curb Weight: 11,800 kg
  • Overall Dimensions: 9000×2500×3530 mm
  • Asphalt Tank Capacity: 8 m³
  • Insulation Thickness: 50 mm
  • Asphalt Spray Rate: 0.25–4.00 L/m²
  • Maximum Spraying Width: 3.75 m
  • Asphalt Heating System: Thermal Oil Heating
  • Number of Spray Nozzles: 30
  • Operation Mode: Intelligent / Manual
  • Working Speed: 2–16 km/h
  • Aggregate Hopper Capacity: 8 m³

Product Detail Images (Product Specifications)

Asphalt Spray Nozzle

Burner

Cab Control Panel

Generator

Insulation Rock Wool

Oil Circuit System

Rear Control Panel

Stone hopper hoist switch

Stone Hopper

Thermal Oil Pump

Factory Production Workshop Diagram

Get A Free Quote

Looking for a suitable special vehicle solution? Please submit your inquiry by completing the form below. Our professional sales team will contact you shortly with product recommendations, technical support, and a customized quotation.
Name
Email*
Telephone
Message
Leave a message
Name
Email*
Telephone
Message