Sinotruk Howo XCMG 16-Ton Truck-Mounted Crane with 5-Section Boom
• Multi-purpose vehicle: handles both transport and lifting operations simultaneously
• Reduces manual loading and unloading, boosting operational efficiency
• High-strength chassis suitable for heavy loads and demanding working conditions
• Long-reach boom offers an extensive operating range
• Versatile cargo handling: one vehicle supports a wide range of business applications
• Customizable to specific operational needs for optimal vehicle suitability
The Sinotruk HOWO XCMG 16 ton truck mounted crane puts a 16-tonne lifting machine and a cargo deck on one four-axle chassis. The crane is mounted directly behind the cab, the flatbed runs behind it, lined with side stake rails, and the whole unit drives to the lift point already loaded. For a contractor who currently hires a mobile crane for every placement, or sends a lorry and a crane separately, that single pass is the practical difference: the steel, the formwork or the equipment arrives on the vehicle that lifts it into position. The upper assembly is an XCMG crane with a five-section telescopic boom that extends in stages. The operator adds reach only for as long as the lift needs, so heavy picks stay on a short, stiff boom and long picks are made with the extra sections out. The boom profile is octagonal, and a planetary slewing system turns the complete upper assembly through a full 360°, which lets a truck parked on one side of a footing still set a load on the far side. Power comes from a 380 hp Weichai engine through a Sinotruk 12-speed manual transmission, with a flange-type power take-off driving the crane's hydraulic pump. This unit suits steel erection and plant construction crews, infrastructure and municipal contractors, and the dealers and importers who supply them. If you are comparing suppliers, ask for the build sheet, the inspection record and the shipping plan for your destination — not just a photograph of the finished truck.
Lift and haul in one pass. The crane and the deck travel together, so a load collected at the yard is delivered and set down by the same vehicle. Crews stop booking a separate mobile crane for placements they can plan a day ahead.
Reach that clears the obstruction. A maximum lifting height of 23.1 m and a maximum boom extension of 21 m let the operator work over scaffold, boundary walls or the top chord of a portal frame instead of backing the truck in under the lift.
A swing that stays controlled. Planetary slewing carries a heavy load through the full 360° turn and stops it where it is wanted, so a beam or a skid comes round and settles onto its marks without drifting past them.
Components your workshop already knows. Weichai engines and Sinotruk transmissions are common in truck fleets across Central Asia, Africa, South America and South-East Asia, so filters, service knowledge and familiar procedures are in place on day one.
Specified for steel structure work. As a 16 ton truck crane for steel structure installation it carries columns, rafters and bracing on the deck and sets them from the standing position the truck already occupies, so the frame is closed out by the crew that delivered it.
Chassis and Driveline
Engine and drivetrain
The 380 hp (279 kW) Weichai engine in the Sinotruk HOWO XCMG 16 ton truck mounted crane makes its torque low in the rev range, which is what a loaded crane truck actually needs: pulling away from a standstill with a full deck, holding road speed on a mountain grade, and creeping across broken ground without riding the clutch. The Sinotruk 12-speed manual gearbox spreads that torque across enough ratios to keep the engine in its band at both ends of the speed range, and a flange-type power take-off drives the crane pump straight off the driveline.
Frame and load path
Lifting puts loads into a chassis that haulage alone never produces. The frame is a 318 mm triple-layer section, reinforced with multi-leaf springs, quadruple U-bolts and dual 16-ton hub-reduction rear axles; hub reduction moves the final gearing into the wheel hubs, so the half-shafts carry less torque and the axle keeps its rating under shock loads. Front and rear axle ratings are 11 / 11 / 12 t across the four axles.
Traction
A V-type thrust rod locates the rear axles, and three differential locks, inter-wheel and inter-axle, keep the truck moving when the access road turns to mud, when the site sits on a slope, or when the only way out is across unpaved ground.
Footprint
The four-axle layout on a 2100 + 4300 + 1350 mm wheelbase spreads the crane and its load over a long footprint, which is what keeps the front axle planted with the boom out over the side. Twelve tyres on 315/80R22.5 18PR casings carry the weight. Gross and axle-weight limits differ by country, so check the permitted figures in your market against this configuration before the build is fixed, and confirm them with the Sinotruk HOWO XCMG 16 ton crane manufacturer when the order is placed.
Crane Superstructure and Boom
Boom
Five telescopic sections extend in sequence, and the operator decides how many to run. That choice is what makes a 16 ton truck crane for steel structure installation usable across different jobs: a short boom is stiffer and carries more, so heavy picks are made close in, while the outer sections are there for height and for reaching over an obstruction. The octagonal profile gives flat bearing faces between sections, which keeps them sliding true and resists the twist a thin-walled or round profile develops under a side load.
Slewing
A planetary slew drive turns the upper assembly through a full 360° on a geared ring. It holds a load firmly through the swing and stops it precisely, which is the difference between lowering a beam onto anchor bolts and chasing it.
Outriggers
The front beams are dual-section and dual-cylinder: two rams push each beam down so the force stays perpendicular to the ground as the beam extends. The rear outriggers are double-chamber telescopic square sections, and the square profile resists rotation under load.
Hydraulics
A plunger pump supplies the crane circuit from the power take-off, and an OEM oil cooler sits in the return path. Heat is the quiet enemy of a working crane, since hot oil thins, functions slow and seals wear faster; the cooler is what lets the unit keep lifting through a long shift instead of standing between picks.
Capacity at Working Radius
Supply Ability & Additional Information
Place of Origin
Hubei, China
Selling Units
Piece/Pieces
Productivity
1000 units/month
Transportation Mode
Ocean Shipping
Monthly Supply Capacity
300 units/month
Certifications
CCC, ISO, CE, EMARK
Loading Ports
Shanghai, Guangzhou, Wuhan
Payment Terms
L/C, T/T
Applicable Incoterms
FOB, CFR, CIF, EXW, FAS
Working radius
Load the 420 kN·m moment allows
Typical pick at that radius
2.7 m
16,000 kg, the rated maximum
Machine bases, plate bundles, close-in heavy picks
3 m
about 14 t
Column base plates, precast rings
5 m
about 8.5 t
Steel columns, formwork bundles
6 m
about 7 t
Rafters, skids, crated plant
8 m
about 5.4 t
Purlins, pipe spools, air-handling units
10 m
about 4.3 t
Roof plant set over a low frame
12 m
about 3.6 t
Panels and sections lifted over a boundary wall
16 m
about 2.7 t
Light assemblies placed at height
20 m
about 2.1 t
Long reach onto a mezzanine or roof deck
Every lift
The load chart issued with your vehicle
Plan from the chart; the rows above are the moment alone
Application Scenarios
Steel structure and portal frame erection. Columns, rafters, purlins and bracing ride in on the deck and are set straight from the crane. For low- to mid-rise frames, a 16 ton truck crane for steel structure installation takes the hand-off between the delivery lorry and a hired erection crane out of the programme.
Plant and factory construction. Pumps, skids, air-handling units and pipe spools arrive loaded and are lifted onto foundations, mezzanine floors or roof decks without a second vehicle standing on site all day.
Precast and infrastructure work. Manhole rings, precast panels, kerbs, barriers and drainage sections are heavy and awkward to handle with anything else, and the crane picks them straight from the deck to the trench line or the alignment.
Municipal and utility jobs. Lighting columns, sign gantries, poles and transformer equipment are lifted into position with the truck parked in the road and the outriggers spread on the verge.
Yards and depots. Rebar bundles, formwork panels, timber packs and containerised plant are moved and stacked in one operation, so the yard does not need a forklift and a crane on the same day.
Industrial equipment installation. Motors, gearboxes, skid-mounted units and machine tools are placed onto anchor bolts, with the full 360° rotation used to square the load up before it lands.
The reinforced heavy-duty chassis and suspension are built for durability during frequent heavy lifting. As a Sinotruk HOWO XCMG 16 ton crane manufacturer, we can adapt OEM customization options to different regulatory and operational standards, helping distributors and importers align the vehicle with local market requirements and plan for bulk procurement and aftermarket support.
Construction Site Material Handling
A typical day with the Sinotruk HOWO XCMG 16 ton truck mounted crane starts in the yard. Steel or equipment is loaded onto the deck with the crane stowed, the driver runs to site, and the crane is set up before anything is unloaded. That order of work is the whole point of the configuration: nothing sits on the ground waiting for a crane to become available.
Setting up is the step that decides how the lift goes. The truck is parked as close to the lift point as the site allows, the front and rear outriggers are extended fully, and pads go under each one. On made ground, check for backfilled trenches, drains, covers and freshly poured slabs, because an outrigger that punches through takes the crane with it. The chassis is levelled before the boom is raised, and the outriggers stay down until the last load is back on the deck.
The pick itself is planned from the load chart, not from the last job. Capacity falls as the boom extends and as the load moves further out, so the operator decides whether to keep the boom short and take the heavier item close in, or run the sections out for reach and accept a lighter load. Because the sections extend individually, that is a real decision on every lift rather than a fixed setup.
Around other trades, the crane's working radius is also its footprint. Full 360° slewing lets the truck serve two elevations from one position, setting a load on the near side and slewing round to place on the far side, but the swing area has to stay clear of people and plant while it happens.
For a contractor running a mixed programme, the truck replaces two separate movements on most days: the delivery run and the lift. One driver, one vehicle pass through the gate, one set of outrigger pads to lay out.
No low-loader and no re-rigging. The crane is part of the truck, so it moves to the next job on its own wheels. A wheeled mobile crane of similar capacity needs a trailer, an escort and a separate mobilisation charge before it lifts anything; this one leaves the yard with material already on the deck.
The boom comes fully in. All five sections retract and the boom settles into its travel cradle over the cab, which is the shortest and stiffest position it has, for the same reason heavy picks are made with the sections in.
Hooks and rope are tied down. The main and auxiliary hooks are reeled up to their travel points and the rope checked for kinks before the truck moves. A hook left swinging damages the boom nose and the cab roof.
Outriggers go fully home. The dual-section front beams and the square-section rear beams are retracted completely, not part-way. A beam left hanging out is the most common damage a crane truck takes on its own site roads.
It travels as an ordinary four-axle truck. It runs the road at normal traffic speed without a pilot vehicle or an escort, and arrives ready to set up rather than to be reassembled.
Grades and the last kilometre. The differential locks earn their place on the wet ramp or the mud track into the next site, and low-speed torque keeps a loaded deck moving on a climb without slipping the clutch.
Check the road rules where you operate. Gross weight, axle loading, overall height with the boom stowed and any route or movement permits are set locally, so confirm the plated figures for your build against your market before the truck ships.
Crane Specifications
Maximum lifting capacity
16,000 kg
Maximum lifting moment
420 kN·m
Maximum boom extension
21 m
Maximum lifting height
23.1 m
Boom sections
5
Boom cross-section
Octagonal
Slewing angle
360° full rotation
Outrigger structure
Double-chamber telescopic square outriggers
Control method
High-seat operation
Crane dead weight
8,200 kg
Installation space
1,150 mm
Brand
Sinotruk HOWO Crane
Chassis
XCMG 16-ton, five-section telescopic boom
Engine power
279 kW (380 hp), Weichai
Transmission
Sinotruk 12-speed manual
Wheelbase
2100 + 4300 + 1350 mm
Number of axles
4 (two front, two rear)
Front axle / rear axle
11 / 11 / 12 t
Frame
318 mm triple-layer
Tyres
12 tyres, 315/80R22.5 18PR
Power take-off
Flange type
Outriggers
Dual-section, dual-cylinder front outriggers
Maximum lifting moment
420 kN·m
Hydraulic system
Plunger pump with OEM oil cooler
Crane controls
Remote controller and high-seat operation
Component Detail
Crane base. The mounting that ties the crane to the chassis frame and carries the slewing ring. It takes the overturning moment of every lift into the frame rails, so the mounting bolts are a routine service check rather than a one-off.
Crane pedestal. The column between the base and the boom pivot. The slewing drive sits inside it and the hydraulic hoses route up through it to the boom.
Main crane hook. The primary hook on the main fall, used for the rated lifts worked out from the load chart.
Crane auxiliary hook. A lighter hook for quick work with small items, where the main fall is more rope than the load needs.
Crane steel wire rope. The lifting rope. Broken wires, kinks and flattened sections are the things to look for, and a lubricated rope lasts far longer than a dry one.
Crane remote controller. A hand-held control that works the crane from the ground, useful when the load is on the far side of the truck or hidden from the high seat.
Upper control levers. The in-cab levers at the high seat, where the operator looks down onto the deck and the lifting point.
Lower control station. The ground-level position beside the truck, used when the high seat does not give a clear view of the load.
Hydraulic radiator. The oil cooler mounted in the crane's hydraulic circuit.
Log grapple. A log grapple attachment is shown fitted for handling timber and logs, which extends the crane's use into yards and forestry work.
Custom Builds and OEM Supply
In practice this crane is ordered to a specification rather than picked off a list. Chassis brand, engine power, emission standard, left- or right-hand drive, body dimensions, working system and optional equipment are settled before the build starts, and the drawings are approved before steel is cut. For distributors and importers, that flexibility is about the market rather than the machine. A build can be aligned with the registration, road-safety and emissions rules the destination country actually enforces, and a dealer ordering several units can standardise on one configuration so the fleet, the driver training and the parts stock all match. As a Sinotruk HOWO XCMG 16 ton crane manufacturer we build to the drawings you approve rather than to a stock list, and the same specification can be repeated on later orders. For OEM and ODM buyers working on industrial installation, the crane is usually part of a wider package. A useful brief is short: the vehicle type, the working conditions, the loads you intend to lift and the destination country. From that we put together a technical proposal with the configuration written out for your approval before production.
Ordering, Delivery and Support
Minimum order. One unit. Single trucks, small fleet orders and orders that mix models are all handled the same way.
Selling unit. Each truck is quoted and shipped as one piece.
Payment terms. L/C and T/T.
Incoterms. FOB, CFR, CIF, EXW and FAS.
Loading ports. Shanghai, Guangzhou and Wuhan.
Shipping mode. Ocean freight, booked as Ro-Ro, flat rack or bulk carrier depending on the route and the vessels available.
Production capacity. 1,000 units a month across the works, with 300 units a month available for this model.
Certifications. CCC, ISO, CE and EMARK.
Build time. Production generally runs 35 to 45 calendar days from deposit and approved drawings; custom superstructure work can move with chassis availability, so confirm the slot before you fix a shipping date.
Before shipment. Every unit is inspected, functionally tested and road tested. Production updates, photographs, video and the final inspection record go to you as the build progresses, and a third-party inspection at the factory can be arranged.
After arrival. Operation guidance, technical support, spare-parts supply and troubleshooting continue once the truck lands.
One supplier for the whole order. Build, inspection, documentation and shipping sit under one contract, so nothing falls into a gap between the factory and the port. The same crane concept is available on smaller chassis. The Dongfeng 6×4 12-ton truck-mounted crane suits buyers who want a shorter, lighter unit for a mixed construction and delivery round, and the Dongfeng 4×2 8-ton truck-mounted crane is the compact option for tight urban sites and for operators buying their first crane truck. Parts support runs across the range as well, including components for the SQZ700-8 35-ton 8-section knuckle boom crane and for the SQS350-5T 14-ton 5-section straight-boom crane. A dealer running more than one model can keep a mixed fleet on a single parts account instead of chasing components from several suppliers.
Supply Chain & Delivery Assurance
Hongda has manufactured and exported special purpose vehicles from Suizhou, Hubei since 2013, operating as an integrated manufacturer and trader. That position lets us pull together the chassis platforms our buyers ask for — DongFeng, HOWO, FOTON, Shacman, ISUZU, FAW, JMC, BYD and JAC — configure each unit to the buyer's own specification, and handle complete vehicles and spare parts as one mixed order through a single export channel. Dealers in Central Asia, Africa, South America and Southeast Asia can start with one unit and scale from there, with one team following the order from specification through consolidation to shipment.
FAQ
Can one truck really handle the delivery and the lift?
Yes, and that is what the layout is for. Load on the flatbed at the yard, drive to the lift point, set the outriggers, and lift with the crane while the rest of the load waits on the deck. What it removes from the programme is a second crane booking and an extra vehicle movement on the same job.
How much can it lift, and how does reach affect that?
Maximum lifting capacity is 16,000 kg at a 420 kN·m lifting moment, but the figure that governs a real lift is the one on the load chart for the boom length and radius you are working at. Capacity falls as the boom extends and as the load moves further out, so plan heavy picks close in with fewer sections out, and use the extra sections for height and reach with a lighter load.
Is this model suited to steel structure erection?
It is built around that work. A 16 ton truck crane for steel structure installation brings columns, rafters, purlins and bracing to the frame on its own deck and sets them from the same standing position, with the five-section boom reaching over the structure and the 360° slew letting the operator place on either side of the truck. On low- to mid-rise portal frames it replaces the separate delivery and erection vehicles.
Where does the operator control the crane from?
From the high seat in the cab, using the upper control levers, which gives a clear view down onto the deck and the lifting point. When that view is blocked, the crane can be worked from the remote controller or from the lower control station at ground level beside the truck.
How do I set up on soft or uneven ground?
Extend the dual-section, dual-cylinder front outriggers and the double-chamber telescopic square rear outriggers fully, and put pads under every one of them. Look for backfilled trenches, drains, covers and fresh concrete before you load them, because an outrigger that punches through is the most common way a crane truck goes over. Level the chassis before the boom is raised.
What maintenance does the boom and slewing system need?
Between jobs, inspect the boom sections for wear on the sliding faces, check the steel wire rope for broken wires and flattening, keep the rope lubricated, and lubricate the slewing system on schedule. Hoses, the oil cooler and the outrigger cylinders should be checked for leaks and damage at the same time. The maintenance guidelines are supplied with the vehicle so your workshop can follow the same routine.
How does the crane travel between sites?
The boom retracts and stows over the cab, the outriggers pull in and the hook is secured before the truck moves. The crane travels on the chassis it is mounted to, so there is no trailer, no re-rigging on arrival and no separate transport booking between jobs, and the vehicle simply drives to the next site as a normal truck.
Looking for a suitable special vehicle solution? Please submit your inquiry by completing the form below. Our professional sales team will contact you shortly with product recommendations, technical support, and a customized quotation.