This is a working sewer truck rather than a tanker with a pump bolted on. It carries a 9 m³ tank package — sewage on one side, jetting water on the other — plus the vacuum plant that lifts the load and the high-pressure plant that clears the pipe. Crews use it to empty blocked chambers, pull out accumulated sludge and wash the connecting run before moving to the next manhole. The chassis is a Dongfeng 4×2 with a diesel engine and an 8-speed transmission: a driveline set up for stop-start collection work rather than the long-distance running of a heavy duty crane truck. Two axles keep the vehicle steady when it parks on a kerbside shoulder, and the wheelbase gives it the turning room that residential lanes, yard entrances and narrow service roads demand. Municipal sanitation departments, drainage and pipeline maintenance contractors, and industrial estates running their own networks are the usual buyers. It suits dealers as well: the chassis and cab are familiar Dongfeng items, so local drivers and workshops already know how to service them and how to source routine parts. Because the jetting water rides on the same vehicle, a call-out no longer needs a suction tanker first and a cleaning unit second. The crew empties, jets and discharges in one visit, and the treatment point is visited once per load instead of twice, which is where the operating saving actually comes from. Hongda is a truck crane manufacturer, and this unit is built alongside recovery vehicles, refuse compactors and refrigerated trucks. The same plant also builds truck-mounted cranes, so a dealer can put together a mixed first order from one factory and one export desk.
Dual-Pump System
The suction side runs on a water-ring vacuum pump rated at 12 m³/min, drawing through a 100 mm suction pipe with a vertical lift of at least 7 m. A water-ring pump seals itself with water instead of vanes running dry, which is what lets it live with the damp, grit-laden air that comes out of a sewer chamber.
Multi-stage filtration sits ahead of both pumps. Screens and staged separation catch the grit and debris that would otherwise reach the rotor or the high-pressure valves, and each stage can be cleaned without dismantling the pump — the difference between a filter change and a pump rebuild.
The cleaning side is a high-pressure pump rated at 21 MPa, fed from the clean-water tank and delivered through 60 m of hose on the rear reel. That length lets the crew stand at the chamber and still work a long way down the connecting pipe without repositioning the truck.
The two circuits are independent, so switching from drawing to jetting does not mean emptying the sewage tank first. A crew can lift a load, change over to the jet, clear the run and return to suction without breaking its working rhythm.
Build, Inspection & Handover
The working systems are then assembled and checked line by line against the build sheet — pump, valves, pipework, control box, ladders and platforms — by a team that also assembles our truck-mounted cranes.
Both circuits are functionally tested — the vacuum side for pull and hold, the high-pressure side for pressure and flow, and every valve cycled through its full travel.
The finished vehicle is road tested for braking, steering and transmission, and every body fitting is checked for anything that could work loose in service.
Before shipment the buyer receives production updates, detail photographs, an operation video and the final inspection record, so the unit is reviewed before it reaches the port.
Independent third-party inspection and factory visits are welcome, in the same way we arrange them on every heavy duty crane truck we export.
After handover, the same team handles operation guidance, technical assistance, spare-parts requests and troubleshooting to keep the vehicle working.
Working Sequence on Site
Position the truck at the chamber with the working area behind it clear, set the parking brake and apply your site's chocking rule. This is where the crew will stand for the whole job.
Open the chamber cover and lower the suction hose, keeping the strainer clear of the floor so it draws liquid rather than a plug of compacted debris.
Engage the vacuum pump and draw the chamber down, checking the tank level as it fills and stopping before the load reaches the top of the barrel.
Change over to the cleaning circuit: unroll the jetting hose from the rear reel, feed the nozzle into the pipe and work it downstream towards the blockage.
Alternate between jetting and suction — loosen the obstruction with the jet, then pull the loosened material back into the chamber and lift it out.
Disconnect, stow the hose and nozzle, drive to the discharge point and empty through the rear outlet, rinsing the working area before the next chamber.
Chassis & Driveline Data
Brand
DongFeng
Engine power
160 kW
Transmission
8-speed transmission
Drive configuration
4×2
Fuel type
Diesel
Wheelbase
4500 mm
Number of axles
2
Number of tires
6
Tire specification
10.00R20 18PR
Curb weight
18,000 kg
Boundary dimension
8000 × 2500 × 3180 mm
Drive side
Left-hand or right-hand drive, agreed before production
Emission standard
Set to the standard your market requires — confirmed when the order is placed
Ordering & Delivery Terms
Minimum order
1 unit
Selling units
Piece/Pieces
Place of origin
Hubei, China
Certifications
CCC, ISO, CE, EMARK
Productivity
1000 units/month
Monthly supply capacity
300 units/month
Transportation mode
Ocean Shipping
Loading ports
Shanghai, Guangzhou, Wuhan
Payment terms
L/C, T/T
Applicable Incoterms
FOB, CFR, CIF, EXW, FAS
Customisation
Chassis brand, engine power, emission standard, drive side, body dimensions and working system agreed before production
Delivery schedule
Confirmed at quotation stage against the agreed specification
Supply Chain & Delivery Assurance
Hongda has manufactured and exported special purpose vehicles from Suizhou, Hubei since 2013, operating as an integrated manufacturer and trader — one of the truck mounted crane manufacturers that also builds sewer cleaning, recovery and refuse units on the same line. That position lets us pull together the chassis platforms our buyers ask for — DongFeng, HOWO, FOTON, Shacman, ISUZU, FAW, JMC, BYD and JAC — configure each unit to the buyer's own specification, and handle complete vehicles and spare parts as one mixed order through a single export channel. Dealers in Central Asia, Africa, South America and Southeast Asia can start with one unit and scale from there, with one team following the order from specification through consolidation to shipment.
FAQ
Can this truck be built on a different chassis, emission standard or drive side?
Yes. Chassis brand, engine power, emission standard, left- or right-hand drive, body dimensions and the working system are set against the order rather than fixed to one stock build. Tell us the destination market, the roads the truck will work and any local registration requirement, and the specification is drawn up around them before production begins. That is the same process we run as a truck crane manufacturer for dealers in Central Asia, Africa, South America and Southeast Asia.
What can the high-pressure jetting side clear that suction alone cannot?
Suction lifts out whatever will flow towards it. Grease, compacted silt and material that has set in the pipe stays put until a jet breaks it loose, which is why this vehicle carries its own clean-water tank and jetting pump instead of relying on a stand-alone suction unit. The nozzle works downstream from the chamber, loosening the obstruction so the suction line can pull it back and lift it out.
How do we keep the vacuum pump out of trouble when the load is gritty?
Most pump damage comes from how the line is used rather than from the pump itself. Keep the suction strainer off the floor of the chamber so it draws liquid instead of a plug of debris, clean the filter screens at the end of every shift, and avoid long periods of dry running. Check the pump mounting and the pipework for rubbing or looseness at each service interval.
What routine work does the vehicle need between jobs?
Flush the high-pressure circuit with clean water after jetting so the nozzle and hose do not sit with residue inside, drain the clean-water tank if the vehicle will stand through freezing weather, and check that the discharge valve seats cleanly. At longer intervals, grease the platform and ladder fixings and check the pump mounts and pipework.
How is this different from a plain sewage suction truck?
A plain suction tanker only empties the chamber, and the pipe stays blocked. This unit adds a high-pressure cleaning circuit with its own clean-water tank, jetting pump and hose reel, so the crew clears the line as well as lifting the load out. On a municipal or contractor route that means one vehicle and one visit per chamber instead of two.
Brand: DongFeng
Engine power (kW): 160
Transmission: 8-speed transmission
Drive configuration: 4×2
Fuel type: Diesel
Wheelbase: 4500 mm
Number of axles: 2
Number of tires: 6
Tire specification: 10.00R20 18PR
Curb Weight(Kg):18000
Boundary Dimension(mm):8000×2500×3180
Tank Volume(m³):6( Sewage tank)+3(Clean water tank )
Tank Thickness(mm):6mm( Sewage tank);4mm(Clean water tank )
Looking for a suitable special vehicle solution? Please submit your inquiry by completing the form below. Our professional sales team will contact you shortly with product recommendations, technical support, and a customized quotation.